Managing construction impacts

During the project, the community may experience a number of construction impacts including noise, vibration, dust, mud, light spill, access and traffic.

The R2P Alliance takes these impacts seriously and a Construction Environmental Management Plan (CEMP) will be implemented to ensure any impacts are mitigated as much as reasonably practicable.

Dust and mud

Due to the nature of the project, dust and mud residue cannot be entirely eliminated during construction. Dust is mostly generated from concrete cutting, excavation, stockpiling, loading trucks with material, heavy vehicle movement and wind erosion. Following rain, mud can be generated at the entrance to exposed work areas by machinery and vehicles exiting the site.

We will minimise mud and dust impacts by:

  • implementing speed restrictions on unsealed surfaces;
  • resurfacing areas as soon as possible;
  • watering work areas and stockpiles;
  • covering stockpiles and transported materials;
  • installing grids and rubble at work site exits to help reduce excess material on tyres;
  • using street sweepers; and
  • using dust monitors to monitor dust.

The R2P Alliance will use dust monitors at strategic locations throughout construction to ensure compliance levels are met.

Light spill

During night works, temporary lighting is needed to illuminate work areas for the safety of the workers and the community. We will minimise light spill by:

  • keeping the amount of light to the minimum required for safe access and works; and
  • directing light towers away from houses where possible.

If you are having issues with the direction of light towers, please contact us so that we can look into possible alternate light positions.

Noise and vibration

Noise will mainly come from heavy machinery, generators for light towers, loading trucks with materials, truck movements and general construction activities. Vibration can occur as a result of rock breaking or where vibratory rollers are used to compact the earth to form a flat level for asphalt laying.

We will use a range of measures to mitigate noise and vibration impacts, including:

  • scheduling the noisiest works during the day or early evening where possible;
  • monitoring noise levels prior to, during and after construction;
  • using low level reversing squawkers (where possible);
  • using static rollers where possible;
  • using radios for crews to communicate;
  • using vibration monitors;
  • enclosing stationary equipment, such as generators, to reduce noise; and
  • regularly testing equipment to ensure it is operating at a high standard.

Pedestrian and cyclist access

Temporary fencing, road barriers and signage are used during construction projects to delineate construction zones and ensure that motorists, cyclists and pedestrians can safely navigate around works sites.

As works progress and access routes change, signage and notifications are used to advise pedestrians and cyclists of any detours.

The R2P Project has also engaged local artist Tracey Davis to paint directional wayfinding artwork on local street footpaths – artwork that will provide directions around construction areas in Croydon Park. These directions will assist pedestrians, cyclists and residents in reaching their destination.

To view changes to pedestrian access please click on the link below.

Pedestrian wayfinding art

Traffic and access

The project is staged to minimise impacts to traffic. There will be some traffic switches throughout the project to ensure traffic flow is maintained around the construction areas. Where works require lane or speed restrictions on a major road, they will be undertaken outside of peak hours or during the night. The R2P Project will work closely with key stakeholders and regularly review traffic management arrangements to ensure that traffic continues to flow as efficiently as possible during construction. A number of local streets around the construction zones are used for deliveries and transporting material around the site. Haulage routes will be coordinated with the City of Port Adelaide Enfield and the community will be advised of regular haulage routes. Roads are also required to be temporarily closed for deliveries and to undertake works. Signage and detours will be in place for restrictions, and residents and businesses will be provided with advance notice around changed conditions. Please visit the works notification page for information on local access changes.

Real-time traffic alerts

For real-time traffic information download the addinsight app for Apple or Android or visit the Traffic SA website.

SitePodium App

Stay up-to-date with the project via the new SitePodium app, click here for more details on how to download the app.

More information

To view the Managing Construction Impact Fact Sheet please click here.

Partners

  • The Department of Infrastructure, Regional Development and Cities is working with every Australian State and Territory to build much-needed infrastructure across a number of individual funding programs.

    Visit website
  • DPTI works as part of the community to deliver effective planning policy, efficient transport, and valuable social and economic infrastructure.

    Visit website
  • Visit website
  • Mott MacDonald is an employee-owned management, engineering, and development consultancy with 16,000 staff in 150 countries.

    Visit website
  • An independent firm of designers, planners, engineers, consultants and technical specialists across all aspects of today's built environment.

    Visit website